Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is exceptionally robust and long-lasting, built for multiple reuses in diverse construction projects. Its design ensures easy assembly and erection, making it the ideal choice for constructions requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight for a loaded container ranges from 22 tons to 25 tons. This must be confirmed prior to loading.
2. Different products require distinct packaging methods:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon the customer's request.
---Bulk: Irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days following receipt of the customer's down payment.
2. Transportation: Dependent on the destination charge port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company, operating our own two factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: What services do you offer?
A: We provide comprehensive suggestions, formwork layout drawings, and quotations tailored to the needs of construction project owners, design institutes, and contractors.
B: Our products are available for contractors, building companies, material suppliers, and trading companies.
C: We also offer our premium formwork products to fellow companies worldwide.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Typically, manufacturing takes 30~60 days, contingent on the type and quantity of products needed.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.