Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork boasts exceptional strength and durability, making it ideal for repeated use in construction projects. Its ease of assembly and erection coupled with a fixed shape and structure make it perfect for high-volume, same-shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight for loaded containers ranges between 22 tons to 25 tons, which must be confirmed prior to loading.
2. We employ various packaging methods tailored to different products:
---Bundles: Utilized for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are packaged in bags and then placed on pallets.
---Wooden cases: Available upon customer's specific request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The timeframe depends on the destination and charge port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated manufacturing plants.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products utilized for
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer comprehensive suggestions, detailed drawings of formwork layouts, and precise quotations to owners, design institutes, and contractors involved in construction projects.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We provide global support to peer companies with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, contingent on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: A 30% T/T advance payment is required, with the balance due before shipment.