Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork, with its robust and durable nature, promises repeated usability in construction activities. Its straightforward assembly and erection make it a prime choice for projects demanding extensive quantities of uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a fully loaded container ranges between 22 to 25 tons, which needs confirmation prior to loading.
2. Various packaging types are employed for different products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk inside the container.
Delivery:
1. Production: For a full container load, the standard production timeline is 20-30 days post receiving the customer's down payment.
2. Transportation: Dependent on the destination charge port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil making company with our own two factories.
Q2: What services do you offer?
A: We design and manufacture formwork products specifically for
bridge and tunnel construction.
Q3: What can you provide for our projects?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our products to contractors, building companies, material suppliers, or trading firms.
C: We support our global peers with exceptional formwork solutions.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawings?
A: It generally takes
3
~7 days depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post contract signing?
A: Typically, it takes 30~60 days based on the type and quantity of products needed.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance payable before shipment.