Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is robust and long-lasting, making it ideal for multiple uses in construction projects. Its quick assembly and fixed shape are perfect for large-scale projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, and this must be confirmed before loading.
2. Various packages are tailored for different products:
---Bundles: Timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: This depends on the destination port charges.
3. Special requirements will be negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in
bridges and tunnels.
Q3: What can you do for us?
A: We provide suggestions, formwork layout drawings, and quotations to construction project owners, design institutes, or contractors.
B: We sell our products to contractors, construction companies, material suppliers, or trading companies.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, based on the type and quantity of products needed.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.