Bridge Formwork System for Viaduct Construction Projects

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Bridge Formwork System for Viaduct Construction Projects
  • Bridge Formwork System for Viaduct Construction Projects
  • Bridge Formwork System for Viaduct Construction Projects
  • Bridge Formwork System for Viaduct Construction Projects
  • Bridge Formwork System for Viaduct Construction Projects
  • Bridge Formwork System for Viaduct Construction Projects
Find Similar Products

Basic Info.

Model NO.
Column template
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is synonymous with robustness and longevity, designed for multiple reuses in various construction projects. Not only is it straightforward to assemble and erect, but its fixed shape and structure make it particularly ideal for projects requiring uniform structural elements, such as high-rise buildings, roads, and bridges.
Bridge Formwork System for Viaduct Construction Projects
Bridge Formwork System for Viaduct Construction Projects
Bridge Formwork System for Viaduct Construction Projects
Bridge Formwork System for Viaduct Construction Projects
 

Packaging:

1. Typically, the total net weight of a loaded container ranges between 22 tons to 25 tons. This must be confirmed prior to loading.
2. We employ diverse packaging solutions tailored to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are securely placed in bags before being arranged on pallets.
---Wooden cases: Available upon customer request, ensuring enhanced protection.
---Bulk: Irregular goods are efficiently loaded in bulk within the container.
Delivery:
1. Production: For a full container, the standard production timeline is 20-30 days post receipt of the customer's down payment.
2. Transportation: Transit time varies depending on the final destination port.
3. Special requirements necessitate further negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil-making company with two proprietary factories.

Q2: What do you do?
A: We expertly design and manufacture formwork products used forbridges and tunnels.

Q3: What can you do for us?
A: We provide comprehensive solutions, including formwork layout designs, suggestions, and detailed quotations to construction project stakeholders such as owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We also serve our global peers with our exceptional formwork products.

Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific details of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, contingent on the type and quantity of products ordered.

Q6: What are your terms of payment?
A: Our terms are 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier