Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, offering multiple reuse opportunities in various construction projects. Its ease of assembly and erection, coupled with its fixed shape and structure, makes it ideal for repetitive and large-scale constructions such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of the loaded container ranges from 22 tons to 25 tons. This needs to be verified before loading.
2. Packaging varies according to the product type:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are packed in bags and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, production typically requires 20-30 days following the receipt of the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in the construction of
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our products directly to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers with our superior formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days depending on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.