Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for unparalleled strength and durability, ensuring it can be reused multiple times across various construction projects. Its ease of assembly and erection makes it a prime choice for projects requiring uniform structural elements, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. Confirmation is required before loading.
2. Tailored packaging solutions for different products include:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, the standard production time is 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery time varies depending on the destination charge port.
3. Special requirements are handled through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What is your specialty?
A: We specialize in designing and manufacturing formwork products specifically for
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: Our products are available for sale to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our top-quality formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.