Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is the epitome of strength and durability, designed to be reused numerous times in various construction projects. Its user-friendly assembly and erection process make it highly efficient. With its fixed shapes and structures, this system is ideal for constructing large quantities of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, requiring confirmation before loading.
2. We employ different packaging methods tailored to each product:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are bagged and placed on pallets for optimal handling.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, our standard production time is 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements: Negotiations are conducted to accommodate special needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil-making company with our own two factories.
Q2: What services do you provide?
A: We design and manufacture premium formwork products specifically for
bridge and tunnel construction.
Q3: What can you offer us?
A: We provide expert suggestions, formwork layout drawings, and detailed quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to generate a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products needed.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.