Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its exceptional strength and durability, making it perfect for multiple reuses in construction projects. Its ease of assembly and erection, combined with a fixed shape and structure, makes it ideal for constructing projects requiring a high quantity of identical shapes, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, needing confirmation before loading.
2. Packaging varies based on the product type:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, the typical production time is 20-30 days after receiving the customer's down payment.
2. Transportation: This depends on the destination port's charge.
3. Special requirements need to be negotiated.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two of our own factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically used for
bridges and tunnels.
Q3: What services do you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and comprehensive quotations to construction project owners, design institutes, and contractors.
B: We sell our products to contractors, construction companies, material suppliers, and trading companies.
C: We support our global peer companies with our outstanding formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.