Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork, renowned for its resilience and longevity, boasts exceptional reusability in construction projects. This formwork is designed for effortless assembly and erection. With its fixed shape and robust structure, it is the ideal choice for large-scale constructions requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This needs to be confirmed before loading.
2. We use various packaging methods for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon the customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production usually takes 20-30 days post-receipt of the customer's down payment.
2. Transportation: Delivery time is contingent on the destination charge port.
3. Special requests necessitate negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What are your main services?
A: We specialize in the design and manufacture of formwork products tailored for
bridge and tunnel constructions.
Q3: How can you assist us?
A: We provide detailed suggestions, formwork layout drawings, and quotations to construction project stakeholders such as owners, design institutes, and contractors.
B: We supply our products directly to contractors, building companies, material suppliers, or trading firms.
C: We extend our superior formwork products to global peers in the industry.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Generally, it requires
3
~7 days, depending on the specific construction project requirements.
Q5: How long is the manufacturing timeline post-contract signing?
A: Typically, it ranges from 30 to 60 days, influenced by the type and quantity of products ordered.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.