Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork for Viaduct Column Construction Solutions is renowned for its strength and durability, allowing it to be reused multiple times across various construction projects. Its ease of assembly and erection, along with a fixed shape and structure, make it highly suitable for constructions involving numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a fully loaded container typically ranges between 22 tons and 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods for various products to ensure optimal protection:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed into bags which are then loaded onto pallets for stability.
---Wooden cases: Available upon customer request to provide extra protection.
---Bulk: Some irregularly shaped goods are loaded directly into the container in bulk.
Delivery:
1. Production Timeline: For a full container, we typically require 20-30 days post receipt of the customer's down payment to complete production.
2. Transportation: The delivery time is dependent on the destination port's specific requirements and conditions.
3. Special Requirements: Any special requirements must be discussed and negotiated to ensure smooth processing.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories, ensuring top-quality production and services.
Q2: What do you specialize in?
A: We specialize in designing and manufacturing formwork products that are essential for
constructing bridges and tunnels, providing reliable and efficient solutions for these projects.
Q3: What services can you provide for us?
A: We offer comprehensive suggestions, detailed drawings of formwork layouts, and precise quotations to owners, design institutes, and contractors involved in construction projects.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products, ensuring international standards and quality.
Q4: How long does it take to provide a brief design and quotation after we supply the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes between 30 and 60 days to manufacture the products, depending on the type and quantity required.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.