• Steel Formwork for Viaduct Column Construction Solutions
  • Steel Formwork for Viaduct Column Construction Solutions
  • Steel Formwork for Viaduct Column Construction Solutions
  • Steel Formwork for Viaduct Column Construction Solutions
  • Steel Formwork for Viaduct Column Construction Solutions
  • Steel Formwork for Viaduct Column Construction Solutions

Steel Formwork for Viaduct Column Construction Solutions

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork for Viaduct Column Construction Solutions is renowned for its strength and durability, allowing it to be reused multiple times across various construction projects. Its ease of assembly and erection, along with a fixed shape and structure, make it highly suitable for constructions involving numerous identical structures, such as high-rise buildings, roads, and bridges.
Steel Formwork for Viaduct Column Construction Solutions
Steel Formwork for Viaduct Column Construction Solutions
Steel Formwork for Viaduct Column Construction Solutions
Steel Formwork for Viaduct Column Construction Solutions
 

Packaging:

1. The total net weight of a fully loaded container typically ranges between 22 tons and 25 tons. This must be confirmed prior to loading.
2. We use different packaging methods for various products to ensure optimal protection:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed into bags which are then loaded onto pallets for stability.
---Wooden cases: Available upon customer request to provide extra protection.
---Bulk: Some irregularly shaped goods are loaded directly into the container in bulk.
Delivery:
1. Production Timeline: For a full container, we typically require 20-30 days post receipt of the customer's down payment to complete production.
2. Transportation: The delivery time is dependent on the destination port's specific requirements and conditions.
3. Special Requirements: Any special requirements must be discussed and negotiated to ensure smooth processing.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories, ensuring top-quality production and services.

Q2: What do you specialize in?
A: We specialize in designing and manufacturing formwork products that are essential forconstructing bridges and tunnels, providing reliable and efficient solutions for these projects.

Q3: What services can you provide for us?
A: We offer comprehensive suggestions, detailed drawings of formwork layouts, and precise quotations to owners, design institutes, and contractors involved in construction projects.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products, ensuring international standards and quality.

Q4: How long does it take to provide a brief design and quotation after we supply the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes between 30 and 60 days to manufacture the products, depending on the type and quantity required.

Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Categories

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001