Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is a paragon of strength and durability, crafted for repeated use in various construction scenarios. Its assembly is straightforward and rapid, boasting a fixed shape and structure ideal for projects requiring uniform structures such as high-rise buildings, roads, and bridges. This system ensures efficiency and reliability in demanding construction environments.
Packaging:
1. Typically, the loaded container's net weight ranges between 22 to 25 tons, subject to confirmation prior to loading.
2. We employ diverse packaging methods tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are securely placed in bags and then loaded onto pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, the production timeline is generally 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration is contingent upon the destination port's location.
3. Special requirements are subject to mutual negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with ownership of two manufacturing facilities.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products utilized in
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products directly to contractors, building firms, material suppliers, and trading companies.
C: We extend our support to global peer companies with our superior formwork products.
Q4: How long does it take to draft a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days depending on the specific requirements of the construction project.
Q5: What is the production timeline post-contract signing?
A: Generally, it takes 30~60 days based on the product type and order quantity.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.