Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
The Steel Formwork system, renowned for its strength and durability, is designed to be reused multiple times in various construction projects. Its easy assembly and fixed shape make it ideal for large-scale constructions requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, subject to confirmation before loading.
2. Various packaging methods are employed for different products:
---Bundles: Used for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed in bags and then on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within containers.
Delivery:
1. Production: For full containers, production generally takes 20-30 days after receiving the down payment from the customer.
2. Transportation: Duration depends on the destination port charges.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridge and tunnel constructions.
Q3: What services can you offer us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: On average, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.