Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork systems are renowned for their strength and durability, offering exceptional reusability in various construction projects. These systems are straightforward to assemble and erect, maintaining fixed shapes and structures. This makes them perfect for applications requiring a large number of identically shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons, and this must be confirmed prior to loading.
2. We utilize different packaging solutions tailored to each product:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are securely placed in bags before being loaded onto pallets.
---Wooden cases: Available upon customer request for specific needs.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, our standard production time is 20-30 days following the receipt of the customer's down payment.
2. Transportation: The delivery time varies depending on the destination port.
3. Special requirements can be discussed and negotiated for custom solutions.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We design and manufacture formwork products specifically for
bridge and tunnel construction.
Q3: What benefits do you offer?
A: We provide detailed suggestions, formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: We supply our products directly to contractors, construction companies, material suppliers, and trading firms.
C: We also support our global peers with our high-quality formwork products.
Q4:How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5:How long does it take to manufacture the products after the contract is signed?
A: Typically, the manufacturing process takes 30-60 days, depending on the type and quantity of products ordered.
Q6:What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.