Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out for its strength and durability, allowing for numerous reuses in various construction projects. Its easy assembly and erection make it ideal for projects requiring a significant amount of same-shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 to 25 tons, pending confirmation prior to loading.
2. We employ different packaging solutions for different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallets: Smaller parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, our standard lead time is 20-30 days post receipt of customer's down payment.
2. Transportation: Timeframes vary depending on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two owned factories.
Q2: What is your primary business?
A: We specialize in designing and manufacturing formwork systems used in
bridge and tunnel construction.
Q3: What services do you provide?
A: We offer expert advice, layout drawings for formwork, and quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading companies.
C: We also support international peer companies with our high-quality formwork products.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific construction project requirements.
Q5: How long does manufacturing take post-contract signing?
A: Generally, it takes 30~60 days, contingent upon the type and quantity of products ordered.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.