Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Crafted with enduring strength and durability, our steel formwork system is designed for repeated use in various construction projects. Its ease of assembly and fixed shape make it ideal for high-rise buildings, roads, bridges, and any project requiring numerous identical structures.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. Our packaging varies according to the product type:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags before being arranged on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we require approximately 20-30 days from receipt of the customer's down payment.
2. Transportation: Timeframes vary based on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products used in
bridge and tunnel construction.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: Our high-quality formwork products also support our peers worldwide.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the type and quantity of products required.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.