Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Experience unmatched strength and durability with our Steel Formwork System. Designed for multiple reuses in the construction industry, it boasts easy assembly and erection. Its fixed shape and structure make it ideal for projects requiring uniform shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. The container's total net weight typically ranges from 22 to 25 tons, to be confirmed before loading.
2. Tailored packaging options for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, and more.
---Pallets: Small parts are bagged and then placed on pallets for secure shipping.
---Wooden cases: Available upon customer request to ensure extra protection.
---Bulk: Irregular goods are loaded in bulk within the container for optimal space utilization.
Delivery:
1. Production: For full containers, we typically require 20-30 days post down payment.
2. Transportation: Duration varies based on the destination port.
3. Special requirements are negotiable to meet your unique needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What is your specialty?
A: We specialize in designing and manufacturing formwork products, particularly for bridges and tunnels.
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our formwork products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork solutions.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Typically, we take
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products ordered.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.