Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out for its exceptional strength and durability, allowing it to be reused multiple times in various construction projects. Its simplicity in assembly and erection makes it a practical choice. This system's fixed shape and structure are ideal for projects requiring a large number of identical structures, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed before loading.
2. We use different packaging methods tailored to each product:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are placed in bags and then securely positioned on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port's location.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a dedicated stencil manufacturing company with two fully operational factories.
Q2: What do you specialize in?
A: We specialize in designing and manufacturing formwork products primarily used for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, and trading companies.
C: We also supply our renowned formwork products to peer companies worldwide.
Q4: How long does it take to create a preliminary design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30-60 days, based on the type and quantity of products required.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the remaining balance due before shipment.