Viaduct Construction Steel Formwork with Customizable Size

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Viaduct Construction Steel Formwork with Customizable Size
  • Viaduct Construction Steel Formwork with Customizable Size
  • Viaduct Construction Steel Formwork with Customizable Size
  • Viaduct Construction Steel Formwork with Customizable Size
  • Viaduct Construction Steel Formwork with Customizable Size
  • Viaduct Construction Steel Formwork with Customizable Size
Find Similar Products

Basic Info.

Model NO.
Column template
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

The Viaduct Construction Steel Formwork, crafted by Beijing Aoyu Template Co., Ltd., is renowned for its strength and durability. This robust formwork can be reused multiple times across various construction projects, ensuring cost-efficiency and reliability. Its ease of assembly and erection makes it an ideal solution for high-rise buildings, roads, bridges, and any construction requiring a significant quantity of identical structural elements.
Viaduct Construction Steel Formwork with Customizable Size
Viaduct Construction Steel Formwork with Customizable Size
Viaduct Construction Steel Formwork with Customizable Size
Viaduct Construction Steel Formwork with Customizable Size
 

Packaging:

1. Typically, the net weight of a fully loaded container ranges between 22 to 25 tons. This weight must be confirmed before loading.
2. Packaging varies based on the product type:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags and then loaded onto pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, production typically requires 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery times vary depending on the destination port.
3. Special requirements necessitate additional negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.

Q3: What services do you provide?
A: We deliver expert suggestions, detailed formwork layout drawings, and quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, construction companies, material suppliers, or trading firms.
C: We support our global partners with our exceptional formwork products.

Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, contingent on the type and quantity of products.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier