Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system boasts unmatched strength and durability, making it a highly reusable solution for construction projects. Its assembly and erection are straightforward and efficient. Designed with a fixed shape and structure, it is ideal for large-scale projects requiring uniform structural components, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges between 22 tons and 25 tons and must be confirmed prior to loading.
2. We utilize various packaging methods tailored for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are packaged in bags and then placed on pallets for secure transport.
---Wooden cases: Available upon customer request to ensure additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk for efficient space utilization in containers.
Delivery:
1. Production: For full container orders, we typically require 20-30 days following receipt of the customer's down payment to complete production.
2. Transportation: Delivery times depend on the destination port's location and associated transit times.
3. Special requirements may necessitate further negotiation to accommodate unique needs.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a distinguished stencil-making company with two proprietary factories, ensuring top-notch production quality.
Q2: What services or products do you provide?
A: We specialize in designing and manufacturing formwork products tailored for
bridge and tunnel constructions.
Q3: How can you assist us in our construction projects?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: Our products are available for sale to contractors, building companies, material suppliers, or trading firms.
C: We extend our exceptional formwork products to support our global peer companies.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: Generally, it takes 30~60 days, influenced by the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.