Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is synonymous with strength and longevity, perfectly engineered for multiple reuses in various construction projects. It boasts ease of assembly and erection, making it the ideal choice for large-scale projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We utilize different packaging methods based on product types:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: Typically, a full container order requires 20-30 days post receipt of customer's down payment.
2. Transportation: Duration varies based on the destination port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a distinguished stencil manufacturing company with two proprietary factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products tailored for
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our superior products to contractors, building companies, material suppliers, and trading firms.
C: We extend our support to global peer companies with our exceptional formwork products.
Q4: How long does it take to draft a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does product manufacturing take after the contract is signed?
A: Typically, manufacturing takes 30~60 days based on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.