Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength, durability, and reusability, making it an ideal choice for repeated use in construction projects. This system boasts ease of assembly and erection, and its fixed shape and structure provide exceptional suitability for high-rise buildings, roads, bridges, and any construction requiring a large quantity of identical structural elements.
Packaging:
1. Typically, the overall net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed prior to loading.
2. Various packaging methods are employed for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then arranged on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods will be loaded in bulk directly into the container.
Delivery:
1. Production: For a full container load, we generally require 20-30 days after receiving the customer's down payment to complete production.
2. Transportation: The delivery timeline is contingent upon the destination charge port.
3. Any special requirements will be addressed through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for construction project owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, construction companies, material suppliers, and trading companies.
C: We proudly support our global industry partners with our top-tier formwork products.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products once the contract is signed?
A: Typically, production takes 30 to 60 days, depending on the type and quantity of products required.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.