Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system boasts unmatched strength and durability, ensuring it can be reused multiple times across various construction projects. Its user-friendly assembly and fixed shape make it ideal for high-volume applications such as high-rise buildings, roads, bridges, and other repetitive structural projects.
Packaging:
1. Typically, the loaded container's total net weight ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. We utilize different packaging methods for diverse products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallets: Small components are packed in bags and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Certain irregular items are loaded in bulk within containers.
Delivery:
1. Production: For full containers, we require approximately 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration varies depending on the destination port.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two proprietary factories.
Q2: What exactly do you specialize in?
A: We design and manufacture formwork products, particularly for
bridge and tunnel construction.
Q3: How can you assist us?
A: We provide owners, design institutes, or contractors with expert suggestions, detailed formwork layout drawings, and precise quotations for construction projects.
B: We supply our formwork products to contractors, construction companies, material suppliers, and trading firms.
C: We support our global peers with our high-quality formwork solutions.
Q4: How long does it take to prepare a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Generally, it takes 30~60 days, contingent on the type and quantity of the products to be manufactured.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.