Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands as a paragon of strength and durability, offering exceptional reusability that is indispensable in construction. With its ease of assembly and erection, coupled with a fixed shape and structure, it is ideal for projects demanding a high volume of uniform construction components, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. We utilize different packaging methods for various products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallets: Smaller parts are placed in bags and then loaded onto pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days post receipt of the customer's down payment.
2. Transportation: Duration is contingent upon the destination port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products utilized in the construction of
bridges and tunnels.
Q3: What can you do for us?
A: We provide comprehensive solutions including suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We supply our formwork products to contractors, building firms, material suppliers, and trading companies.
C: We bolster our global peer companies with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post contract signing?
A: Typically, it takes 30~60 days, based on the product type and quantity to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.