Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is robust and highly durable, allowing for multiple reuses in construction endeavours. Its assembly and erection are straightforward, and its fixed shape and structure make it ideal for projects requiring large quantities of identical structural forms, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Various packaging methods are employed for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days following receipt of the customer's down payment.
2. Transportation: Dependent on the destination charge port.
3. Special requirements will require further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a specialized stencil-making company with two dedicated factories.
Q2: What services do you provide?
A: We design and manufacture formwork products tailored for
bridges and tunnels.
Q3: What can your company offer us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, or construction contractors.
B: We supply our formwork products to contractors, building companies, material suppliers, and trading firms.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to produce a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30-60 days, contingent on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.