Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is engineered for exceptional strength and durability, enabling multiple reuses in various construction projects. With its straightforward assembly and erection process, this formwork is ideal for large-scale projects requiring uniform structural shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the loaded container's total net weight ranges from 22 to 25 tons, requiring confirmation prior to loading.
2. We use distinct packaging methods for different products:
---Bundles: For timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk inside the container.
Delivery:
1. Production: For full containers, we typically require 20-30 days post-receipt of the customer's down payment to complete production.
2. Transportation: Time varies depending on the destination charge port.
3. Special requirements: Negotiation is necessary.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a distinguished stencil making company with two proprietary factories.
Q2: What exactly do you do?
A: We specialize in designing and manufacturing formwork products primarily used for
bridges and tunnels.
Q3: What services can you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our high-quality formwork products to contractors, construction companies, material suppliers, and trading companies.
C: We also support global peer companies with our innovative formwork products.
Q4: How long will it take to create a brief design and quotation once we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: A 30% T/T deposit in advance, with the balance due before shipment.