Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork is the epitome of strength and durability, designed for repeated use across various construction projects. Easy to assemble and erect, the formwork's fixed shape and structure make it ideal for high-rise buildings, roads, bridges, and any project requiring uniform structure in large quantities.
Packaging:
1. Typically, the total net weight for a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. Packaging varies according to the product type:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon the customer's request.
---Bulk: Irregular items are loaded in bulk in the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days following receipt of the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements may necessitate negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: What services do you offer?
A: We provide expert suggestions, formwork layout drawings, and detailed quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We extend our superior formwork products to peer companies worldwide.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, based on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T advance, with the balance due before shipment.