Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, making it highly reusable in construction projects. Easy to assemble and erect, it offers fixed shapes and structures, making it ideal for projects requiring large quantities of identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container is between 22 and 25 tons, which must be confirmed prior to loading.
2. We use different packaging methods tailored to specific products:
---Bundles: Ideal for items like timber beams, steel props, and tie rods.
---Pallets: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with two of our own factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What services can you provide us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: We sell our products directly to contractors, building companies, material suppliers, and trading companies.
C: We support our global peer companies with our premium formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days based on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance payable before shipment.