Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is robust and durable, guaranteeing multiple reuse cycles in construction projects. Its easy assembly and erection process make it ideal for large-scale applications requiring consistent structural shapes, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, a fully-loaded container has a net weight of 22 to 25 tons. This needs to be confirmed prior to loading.
2. Different packaging methods are employed based on the product type:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are bagged and then placed on pallets for secure transportation.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days post receipt of the customer's down payment.
2. Transportation: This varies based on the destination port's location.
3. Special requirements will necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company, boasting two dedicated factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products used in
bridge and tunnel construction.
Q3: What can you provide us?
A: We deliver expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We support our international peers with our premium formwork products.
Q4: How long does it take to provide a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture products post-contract signing?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products ordered.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.