Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork stands out for its robustness and longevity, making it an ideal choice for repetitive use in construction projects. Designed for ease of assembly and erection, this formwork maintains a consistent shape and structure, perfectly suited for large-scale applications requiring uniform configurations, such as skyscrapers, highways, and bridges.
Packaging:
1. Typically, the loaded container's net weight ranges between 22 to 25 tons, subject to confirmation before loading.
2. We offer diverse packaging solutions tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small components are bagged and placed on pallets for secure shipment.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular items are loaded in bulk to optimize container space.
Delivery:
1. Production Timeline: For a full container load, we typically require 20-30 days post receipt of customer's down payment.
2. Transportation: Delivery time varies based on the destination charge port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a distinguished stencil manufacturing company, boasting two fully operational factories.
Q2: What is your primary business?
A: We specialize in the design and manufacture of high-quality formwork products for
bridges and tunnels.
Q3: What services can you provide?
A: We offer expert advice, formwork layout drawings, and quotations to project stakeholders such as owners, design institutes, and contractors.
B: Our products are sold to contractors, construction firms, material suppliers, and trading companies.
C: We also supply our superior formwork products to peer companies globally.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products post-contract signing?
A: Generally, the manufacturing process spans 30~60 days, contingent on the type and quantity of the ordered products.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.