Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands as a paragon of strength and durability, offering unmatched reusability in construction projects. Its ease of assembly and erection, combined with a fixed shape and structure, makes it ideal for large-scale projects requiring uniform structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a fully loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We utilize different packaging methods for various products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery timeline depends on the destination charge port.
3. Special requirements can be discussed and negotiated to meet your specific needs.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a distinguished stencil-making company, owning and operating two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products tailored for
bridge and tunnel constructions.
Q3: What services can you provide for us?
A: We offer consultation, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and construction contractors.
B: We supply our top-tier products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, contingent on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.