Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork, designed for strength and durability, offers remarkable reusability in construction projects. Its easy assembly and erection make it ideal for high-rise buildings, roads, bridges, and any project requiring uniform-shaped structures.
Packaging:
1. The total net weight of a loaded container ranges between 22 to 25 tons, requiring confirmation before loading.
2. Diverse packaging methods are employed for different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are packed in bags and placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, the standard production time is approximately 20-30 days after receiving the down payment.
2. Transportation: Dependent on the destination port charges.
3. Special requirements may require additional negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two proprietary factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, or contractors.
B: We sell our products to contractors, construction companies, material suppliers, and trading companies.
C: We support global peer companies with our premium formwork products.
Q4: How long does it take to provide a design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days based on specific project requirements.
Q5: How long does it take to manufacture products after signing the contract?
A: Typical manufacturing time ranges from 30 to 60 days, depending on the type and quantity of the products.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.