Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its exceptional strength and durability, making it a highly reusable solution in the construction industry. With ease of assembly and erection, this system is designed to maintain a fixed shape and structure, making it ideal for projects requiring a large volume of uniformly shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed prior to loading.
2. We use different packaging methods tailored to specific products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are secured in bags and then placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production Timeline: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Timeframes depend on the destination charge port.
3. Special Requirements: Negotiation is essential for any bespoke needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturer with our own two factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for owners, design institutes, or contractors involved in construction projects.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We extend our support to global peer companies with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days based on the type and quantity of the products to be produced.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.