Viaduct Column Steel Formwork System for Structural Builds

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Viaduct Column Steel Formwork System for Structural Builds
  • Viaduct Column Steel Formwork System for Structural Builds
  • Viaduct Column Steel Formwork System for Structural Builds
  • Viaduct Column Steel Formwork System for Structural Builds
  • Viaduct Column Steel Formwork System for Structural Builds
  • Viaduct Column Steel Formwork System for Structural Builds
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is renowned for its exceptional strength and durability, making it a highly reusable solution in the construction industry. With ease of assembly and erection, this system is designed to maintain a fixed shape and structure, making it ideal for projects requiring a large volume of uniformly shaped structures, such as high-rise buildings, roads, and bridges.
Viaduct Column Steel Formwork System for Structural Builds
Viaduct Column Steel Formwork System for Structural Builds
Viaduct Column Steel Formwork System for Structural Builds
Viaduct Column Steel Formwork System for Structural Builds
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed prior to loading.
2. We use different packaging methods tailored to specific products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are secured in bags and then placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production Timeline: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Timeframes depend on the destination charge port.
3. Special Requirements: Negotiation is essential for any bespoke needs.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturer with our own two factories.

Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.

Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for owners, design institutes, or contractors involved in construction projects.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We extend our support to global peer companies with our superior formwork products.

Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days based on the type and quantity of the products to be produced.

Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier