Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its strength and durability, allowing it to be reused multiple times across various construction projects. It is designed for ease of assembly and erection. With its fixed shape and structure, it is ideal for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges between 22 tons to 25 tons and must be confirmed prior to loading.
2. We use different packaging methods for various products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags and then on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days from receipt of the customer's down payment.
2. Transportation: Duration depends on the destination's port charges.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with two dedicated factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our international peers with our exceptional formwork solutions.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of the products to be manufactured.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the balance due before shipment.