Essential Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Overview
Steel Formwork System
Our steel formwork is engineered for robustness and longevity, making it ideal for repeated use in construction projects. It is designed for effortless assembly and installation, providing a fixed shape and structure that is perfectly suited for projects requiring a high volume of identical structures, such as high-rise buildings, roads, and bridges.
Packaging Details:
1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons, which must be confirmed before loading.
2. We offer various packaging solutions tailored to different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are packed in bags and placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery Information:
1. Production: For full container loads, a typical production timeline is 20-30 days after receiving the customer's down payment.
2. Transportation: Duration varies based on the destination port.
3. Special requirements may necessitate further negotiation.
Frequently Asked Questions
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products utilized for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, formwork layout designs, and quotations for construction project owners, design institutes, and contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading firms.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: What is the manufacturing timeline after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.