Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork is renowned for its strength and durability, making it ideal for multiple uses in various construction projects. It boasts easy assembly and erection, with a fixed shape and structure. This makes it perfect for large-scale projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons, which must be confirmed prior to loading.
2. We use different packaging methods tailored for various products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallets: Small parts are secured in bags and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, our production timeline is typically 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time is contingent upon the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What is your area of expertise?
A: We specialize in designing and manufacturing formwork products used primarily for
bridges and tunnels.
Q3: How can you assist us?
A: We provide suggestions, detailed formwork layout drawings, and quotations to owners, design institutes, or construction project contractors.
B: We sell our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global partners with our premium formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products to be produced.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.