Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
The Steel Formwork System we offer is renowned for its strength and durability. Designed to be reused multiple times, this system ensures ease of assembly and erection, making it perfect for high-rise buildings, roads, bridges, and any project needing repetitive structural forms. Its fixed shape and structure significantly optimize construction efficiency.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed before loading.
2. We tailor our packaging according to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and placed on pallets for organized transport.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within containers.
Delivery:
1. Production: For a full container load, we usually require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements can be accommodated through negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in the design and manufacture of formwork products, particularly for
bridges and tunnels.
Q3: What services do you provide?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to construction project owners, design institutes, and contractors.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.