Basic Information
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Comprehensive Product Description
Revolutionary Steel Formwork System
Our steel formwork system stands out for its impressive strength and durability, making it ideal for repeated usage in construction projects. It's designed for easy assembly and erection, offering a fixed shape and structure perfect for high-volume projects such as high-rise buildings, roads, and bridges.
Packaging Details:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. We employ different packaging methods tailored to various products:
---Bundles: Used for items such as timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Irregularly shaped goods are loaded in bulk in containers.
Delivery Information:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements can be negotiated.
Frequently Asked Questions
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two factories.
Q2: What services do you provide?
A: We specialize in the design and manufacture of formwork products.
These are primarily used for bridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and detailed quotations for construction project stakeholders.
B: Our products are sold to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers with our premium formwork products.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes between 30 to 60 days, based on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.