Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is celebrated for its strength and durability, making it ideal for repeated use in construction. Its easy assembly and fixed shape make it perfect for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed before loading.
2. Various packaging methods are employed based on the product type:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination charge port.
3. Special requirements necessitate negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What services can you provide?
A: We offer expert advice, formwork layout drawings, and quotations to owners, design institutes, or contractors of construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our premium formwork products.
Q4: How long does it take to draft a design and provide a quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days depending on the specific construction project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, production takes 30~60 days based on the type and quantity of products ordered.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.