Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
The Steel Formwork System is renowned for its strength and durability, making it a highly reusable asset in construction projects. Its ease of assembly and erection, coupled with its fixed shape and structure, provides exceptional suitability for projects requiring a high volume of similarly shaped structures, such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be verified before loading.
2. Various packaging methods are employed based on the specific product:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are packaged in bags and then placed on pallets.
---Wooden Cases: Available upon customer's request.
---Bulk: Used for loading irregular goods in bulk within the container.
Delivery:
1. Production: For a full container load, production typically requires 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products primarily used for
bridges and tunnels.
Q3: What solutions can you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to owners, design institutes, and contractors of construction projects.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.