Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Adjustable Steel Formwork for Viaduct Bridge Construction stands out due to its strength and durability, enabling multiple reuses in various construction projects. This formwork system is not only easy to assemble and erect but also maintains a fixed shape and structure, making it ideal for large-scale constructions that require uniform structural components, such as high-rise buildings, roads, and bridges.
Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Different products are packaged in different ways:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Some irregularly shaped goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, the production timeline is typically 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration depends on the destination port's charges.
3. Special requirements will be negotiated to meet specific customer needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories of our own.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to owners, design institutes, or contractors involved in construction projects.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support fellow companies worldwide with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30-60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.