Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork, renowned for its strength and durability, is perfect for repeated usage in construction. Its ease of assembly and erection makes it an ideal choice for projects requiring a large number of identical-shaped structures such as high-rise buildings, roads, and bridges.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, requiring confirmation prior to loading.
2. Various packaging solutions are tailored for different products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Small parts are secured in bags and then placed on pallets.
---Wooden Cases: Available upon customer request for additional protection.
---Bulk: Some irregularly shaped goods are loaded in bulk containers.
Delivery:
1. Production: For a full container, production typically takes 20-30 days after receiving the customer's down payment.
2. Transportation: Duration depends on the destination port.
3. Special requirements warrant further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturing company with two factories of our own.
Q2: What services do you offer?
A: We specialize in designing and manufacturing formwork products utilized for
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed drawings of formwork layouts, and competitive quotations to owners, design institutes, or contractors involved in construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with high-quality formwork products.
Q4: How long does it take to produce a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: It typically takes 30~60 days, contingent on the type and quantity of products to be manufactured.
Q6: What are your terms of payment?
A: We require a 30% T/T in advance, with the balance due before shipment.