Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is renowned for its exceptional strength and durability, allowing it to be reused multiple times throughout construction projects. Its ease of assembly and erection makes it an indispensable asset. With its fixed shape and robust structure, this formwork is perfectly suited for projects requiring a high volume of identical structural components, such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We employ various packaging methods tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are bagged and then placed on pallets for secure transport.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly-shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, production typically requires 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery times vary depending on the destination port.
3. Special requirements may necessitate further negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products tailored for
bridges and tunnels.
Q3: How can your company assist us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and construction contractors.
B: We supply our high-quality products to contractors, building firms, material suppliers, and trading companies.
C: Our superior formwork products support our peer companies worldwide.
Q4: How long does it take to create a preliminary design and quotation once structural drawings are provided?
A: Generally, it requires
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture products after the contract is signed?
A: Typically, it takes between 30 to 60 days, depending on the type and quantity of products needed.
Q6: What are your payment terms?
A: We require a 30% T/T payment in advance, with the balance due before shipment.