Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork stands as a paragon of strength and durability, ensuring multiple reuses across diverse construction projects. Its easy assembly and erection make it an ideal choice, particularly for projects requiring a high volume of identical structural shapes, such as high-rise buildings, roads, bridges, and more.
Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We utilize various packaging solutions tailored to different product types:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Small components are bagged and then placed on pallets.
---Wooden Cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, the production timeline is generally 20-30 days following receipt of the customer's down payment.
2. Transportation: Delivery times depend on the destination charge port.
3. Special requirements are subject to negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products for
bridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and construction contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading companies.
C: We support peer companies worldwide with our superior formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, the manufacturing process takes 30~60 days, depending on the type and quantity of the products.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.