Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands out for its exceptional strength and durability, ensuring it can be reused multiple times across various construction projects. This system is designed for easy assembly and erection, making it the perfect solution for constructions requiring a consistent shape and structure. Ideal applications include high-rise buildings, roads, bridges, and more, where uniformity and reliability are paramount.
Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use distinct packaging methods tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are packaged in bags and then placed on pallets for easy handling.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container for optimal space utilization.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery time varies based on the destination port's location and associated charges.
3. Special requirements may necessitate additional negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with two dedicated factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in the construction of
bridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We offer our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We proudly support our global peers with our superior formwork products.
Q4: How long does it take to make a brief design and quotation after we provide the structural drawing?
A: Generally, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.