• Steel Formwork for Viaduct Column Construction Projects
  • Steel Formwork for Viaduct Column Construction Projects
  • Steel Formwork for Viaduct Column Construction Projects
  • Steel Formwork for Viaduct Column Construction Projects
  • Steel Formwork for Viaduct Column Construction Projects
  • Steel Formwork for Viaduct Column Construction Projects

Steel Formwork for Viaduct Column Construction Projects

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System stands out for its exceptional strength and durability, ensuring it can be reused multiple times across various construction projects. This system is designed for easy assembly and erection, making it the perfect solution for constructions requiring a consistent shape and structure. Ideal applications include high-rise buildings, roads, bridges, and more, where uniformity and reliability are paramount.
Steel Formwork for Viaduct Column Construction Projects
Steel Formwork for Viaduct Column Construction Projects
Steel Formwork for Viaduct Column Construction Projects
Steel Formwork for Viaduct Column Construction Projects
 

Packaging:

1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We use distinct packaging methods tailored to different products:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallet: Smaller parts are packaged in bags and then placed on pallets for easy handling.
---Wooden cases: Available upon customer request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container for optimal space utilization.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery time varies based on the destination port's location and associated charges.
3. Special requirements may necessitate additional negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with two dedicated factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used in the construction ofbridges and tunnels.

Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We offer our high-quality products to contractors, construction companies, material suppliers, and trading firms.
C: We proudly support our global peers with our superior formwork products.

Q4: How long does it take to make a brief design and quotation after we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products required.

Q6: What are your terms of payment?
A: We require 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001