• Bridge Formwork System for Bridge Construction
  • Bridge Formwork System for Bridge Construction
  • Bridge Formwork System for Bridge Construction
  • Bridge Formwork System for Bridge Construction
  • Bridge Formwork System for Bridge Construction
  • Bridge Formwork System for Bridge Construction

Bridge Formwork System for Bridge Construction

After-sales Service: Yes
Warranty: One Year
Certification: ISO
Material: Steel
Type: Column Formwork
ODM or OEM: Yes
Customization:
Manufacturer/Factory
Diamond Member Since 2024

Suppliers with verified business licenses

Beijing, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (18)

Basic Info.

Model NO.
Column template
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Information
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System stands out for its remarkable strength and durability, allowing for multiple reuses in various construction projects. Its user-friendly assembly and erection features make it perfect for projects requiring repetitive, same-shaped structures. Ideal for high-rise buildings, roads, bridges, and more, this formwork system ensures efficiency and consistency in construction.
Bridge Formwork System for Bridge Construction
Bridge Formwork System for Bridge Construction
Bridge Formwork System for Bridge Construction
Bridge Formwork System for Bridge Construction
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We provide tailored packaging solutions for different products:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallet: Small parts are placed in bags and then arranged on pallets for secure handling.
---Wooden cases: Available upon customer request to ensure safe transportation.
---Bulk: Irregularly shaped goods are loaded in bulk within the container for optimal space utilization.
Delivery:
1. Production: For a full container, production typically requires 20-30 days post receipt of the customer's down payment.
2. Transportation: The delivery timeframe varies based on the destination port.
3. Special requirements: Negotiations are necessary to accommodate any unique customer needs.

Frequently Asked Questions (FAQ)
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What services do you offer?
A: We specialize in designing and manufacturing high-quality formwork products used forbridge and tunnel construction.

Q3: How can you assist us in our construction projects?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations tailored to the needs of owners, design institutes, or contractors engaged in construction projects.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We also support peer companies globally by offering our exceptional formwork products.

Q4: How long does it take to create a preliminary design and quotation after we submit the structural drawing?
A: Generally, it takes3
to 7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products post-contract signing?
A: Typically, the manufacturing process requires 30 to 60 days, contingent on the type and quantity of products ordered.

Q6: What are your terms of payment?
A: Our payment terms are 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Product Categories

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001