Steel Formwork Solution for Viaduct Construction Projects

Product Details
Customization: Available
After-sales Service: Yes
Warranty: One Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (19)
  • Steel Formwork Solution for Viaduct Construction Projects
  • Steel Formwork Solution for Viaduct Construction Projects
  • Steel Formwork Solution for Viaduct Construction Projects
  • Steel Formwork Solution for Viaduct Construction Projects
  • Steel Formwork Solution for Viaduct Construction Projects
  • Steel Formwork Solution for Viaduct Construction Projects
Find Similar Products

Basic Info.

Model NO.
Column template
Certification
ISO
Material
Steel
Type
Column Formwork
ODM or OEM
Yes
Size
Customized
Thickness
Customized
Transport Package
Container
Origin
Aoyu
HS Code
7308900000
Production Capacity
160000square Meters/Year

Product Description

Basic Info.
Model NO. AY86,AY106,AY126, Material Steel Wood
Type Pier pillar formwork Specification Q235B
Panel thickness 6mm Width 500-6000mm
Maxmum lateral pressure 80 kn/square meter Height 2000mm
Guardrail height 1200mm Appliation scope Roads,Railways,Water conservancy
Number of Platform 2m/layer Width of Operating Platform 900mm
Transport Package Package Box, Steel Pallet, Steel Frame, Container Brand Aoyu
Origin China Production Capacity 14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork is renowned for its robust durability, allowing for multiple reuses throughout various construction projects. This system is designed for ease of assembly and erection, providing a fixed shape and structure ideal for projects requiring repetitive, same-shaped constructions such as high-rise buildings, roads, and bridges.
Steel Formwork Solution for Viaduct Construction Projects
Steel Formwork Solution for Viaduct Construction Projects
Steel Formwork Solution for Viaduct Construction Projects
Steel Formwork Solution for Viaduct Construction Projects
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, and this must be confirmed prior to loading.
2. We utilize different packaging methods tailored to each product:
---Bundles: Used for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are placed in bags and then organized on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods will be loaded in bulk into the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days following the receipt of the customer's down payment.
2. Transportation: Delivery time varies depending on the destination charge port.
3. Special requirements can be discussed and negotiated.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with our own two factories.

Q2: What services do you provide?
A: We specialize in the design and manufacturing of formwork products forapplications such as bridges and tunnels.

Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: Our products are available for purchase by contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our superior formwork products.

Q4: How long does it take to provide a brief design and quotation once we submit the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days depending on the type and quantity of the products to be produced.

Q6: What are your terms of payment?
A: Our terms are 30% T/T in advance, with the balance due before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier