Basic Info.
Model NO. |
AY86,AY106,AY126, |
Material |
Steel Wood |
Type |
Pier pillar formwork |
Specification |
Q235B |
Panel thickness |
6mm |
Width |
500-6000mm |
Maxmum lateral pressure |
80 kn/square meter |
Height |
2000mm |
Guardrail height |
1200mm |
Appliation scope |
Roads,Railways,Water conservancy |
Number of Platform |
2m/layer |
Width of Operating Platform |
900mm |
Transport Package |
Package Box, Steel Pallet, Steel Frame, Container |
Brand |
Aoyu |
Origin |
China |
Production Capacity |
14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork is built for strength and durability, allowing for numerous reuses in construction projects. The system is designed for easy assembly and erection, making it ideal for high-volume, same-structure projects such as high-rise buildings, roads, and bridges.
Packaging:
1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons, which will be confirmed prior to loading.
2. We utilize different packaging methods tailored to specific product needs:
---Bundles: For items like timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods will be loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: Duration varies based on the destination port.
3. Special requirements can be discussed and negotiated.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil making company with two of our own factories.
Q2: What do you specialize in?
A: We design and manufacture formwork products specifically for
bridge and tunnel construction.
Q3: What services can you provide for us?
A: We offer expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers with our superior formwork products.
Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Typically, it takes
3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.